After creating a slope with a fresh mud bed using MAPEI's 4 to 1 Mud Bed Mix, the area should be allowed to cure for at least 24 hours per inch (centimeter) plus one day before application of MAPEI's Mapelastic AquaDefense. For example, if the mud bed is at 2" (5 cm) depth at its highest level, then you must wait three days before the application of Mapelastic AquaDefense. Curing time is based on a temperature of 73°F (23°C). Cooler temperatures will require longer curing times. If your project is on a fast track, consider Planislope RS mortar, which can receive waterproofing in a matter of hours.