Klang Valley Mass Rapid Transit (KVMRT)

Location icon Malaysia
Ref #: 60000032
Category: INFRASTRUCTURES

Construction

Yard Klang Valley Mass Rapid Transit (KVMRT)
Location Malaysia
Subcategory METRO
Built in 2013
Opened in 2014
Application Klang Valley Mass Rapid Transit (KVMRT) - Bukit Bintang Central Underground Station
Start and finish date 2013/2014
Application Type Waterproofing systems
Client Mass Rapid Transit Corporation Sdn Bhd
Contractor company MMC Gamuda KVMRT (T) Sdn Bhd
Installer companies CRT Specialist (M) Sdn Bhd
Architects Mott MacDonald (M) Sdn Bhd (Engineers)
MAPEI Distributor Mapei Malaysia Sdn Bhd
Other The Bukit Bintang Central station is constructed using the “cut-and-cover” method with a total excavation depth of 33m. It has a footprint of 150m x 19.0m with depths of 16.9m from existing ground level to the top of rail level for the upper platform and 30.4m to the top of rail level for the lower platform. The station consists of four levels namely concourse, upper platform, plant-room platform and lower platform. The main contractor wanted a durable, high-performance waterproofing system, "MAPEI Purtop" for the roof slab to provide long-term, low-maintenance protection against water ingress. (The walls were protected using a drainage system.)

Product used for the project

PRIMER SN
PRIMER SN
Two-component, epoxy filling primer. Primer SN is a two-component, solvent-free…
PURTOP 1000
PURTOP 1000
Two-component, solvent-free, pure polyurea membrane applied by spray with a…
334 - BIBLOCK
BIBLOCK
Product not available for this market,
contact us
434 - IDROSTOP SW
IDROSTOP SW
Product not available for this market,
contact us
943 - IDROSTOP TUBOFLEX
IDROSTOP TUBOFLEX
Product not available for this market,
contact us
2299 - MAPEGEL UTT SYSTEM
MAPEGEL UTT SYSTEM
Product not available for this market,
contact us

Keep in touch

Subscribe to our newsletter to get Mapei news