Hotel du Barrage

Location icon Hérémence, Switzerland
Ref #: 4631
Category: TOURISM AND WELLNESS

Construction

Yard The new linoleum floor of the hotel rooms at Hotel du Barrage was installed with Ultrabond Eco 530.
Location Hérémence, Switzerland
Subcategory HOTEL/INN
Application The old coverings were torn off, the substrates sanded and primed with Eco Prim Grip Plus.
Start and finish date 2022
Application Type Floor/wall covering
Architects Mijong Architecture Design
Specialists involved Grande Dixence SA
MAPEI Coordination Marcello Maieron

Product used for the project

ECO PRIM GRIP PLUS
ECO PRIM GRIP PLUS
Multi-purpose, ready-to-use, low odour, bonding promoter primer with a very low…
ULTRABOND ECO 530
ULTRABOND ECO 530
Adhesive with high and fast initial bond. For the wet-bed installation of…
PLANIPATCH XTRA
PLANIPATCH XTRA
Product not available for this market,
contact us
ULTRAPLAN ECO XTRA
ULTRAPLAN ECO XTRA
Product not available for this market,
contact us

Keep in touch

Subscribe to our newsletter to get Mapei news