Kho bãi | The existing gallery was extended by 320 metres with the new building. |
---|---|
Vị trí | Disentis, Switzerland |
Danh mục con | HẦM |
Ứng dụng | By extending the avalanche gallery, the average duration of closures of the Lukmanier road can be reduced from 37 days today to 19 days in the future. A total of 9 400 m³ of Dynamon SR 912 CH was used. |
Ngày bắt đầu và hoàn thành | 2021 |
Loại ứng dụng | Roading |
Công ty lắp đặt | Matteo Muttoni Costruzioni SA, Via Murate 6, 6500 Bellinzona |
Quản lý dự án | Kanton Graubünden |
Điều phối MAPEI | Marco Jungi |