Kho bãi | road tunnel, safety tunnel |
---|---|
Vị trí | Noiraigue, Switzerland |
Danh mục con | HẦM |
Ứng dụng |
After 50 years of service, the 1 km long Tunnel de la Clusette no longer met the required safety standards.
It was repaired with our sealing products. The project essentially comprises the renovation of the existing tunnel and the construction of a safety tunnel parallel to the road tunnel, which will enable the tunnel to be evacuated in the event of a fire. It should also be possible to use the safety tunnel as a pedestrian and cycling path. |
Ngày bắt đầu và hoàn thành | 2022/2026 |
Loại ứng dụng | Công trình ngầm |
Công ty lắp đặt | Renesco AG, Moosseedorf |
Kiến trúc sư | Groupement BG ingénieurs conseils SA, Marin-Epagnier | OPAN concept SA, Neuchâtel |
Quản lý dự án | Canton Neuchâtel |
Điều phối MAPEI | Stefan Niederberger |