Rothorn Sörenberg

Location icon Sörenberg, Switzerland
The rock, especially in the last third towards Eisee, is cleaned in the first phase and loose areas are removed. The rock is sealed with a layer of shotcrete so that no more stones can fall down. At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting. This prevents ice from forming overhead and ensures the safety of winter sports enthusiasts.
Số tham chiếu: 4658
Danh mục: GIAO THÔNG VẬN TẢI

Xây dựng

Kho bãi ceiling of the passage tunnel
Vị trí Sörenberg, Switzerland
Danh mục con HẦM
Ứng dụng At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting.
Ngày bắt đầu và hoàn thành 2023
Loại ứng dụng Công trình ngầm
Công ty lắp đặt Gasser Felstechnik AG, Lungern
Quản lý dự án Rothornbahn Sörenberg
Hạng mục Ramon Lehmann Fotografie
Điều phối MAPEI Urs Wirth

Sản phẩm đã sử dụng cho dự án

MAPEQUICK AF 300 DRY
MAPEQUICK AF 300 DRY
Phụ gia đóng rắn nhanh không chứa kiềm dùng cho bê tông phun
LAMPOCEM Blitzzement
LAMPOCEM Blitzzement
Product not available for this market,
contact us
MAPELASTIC TU SYSTEM
MAPELASTIC TU SYSTEM
Product not available for this market,
contact us

Giữ liên lạc

Hãy đăng ký nhận bản tin của chúng tôi để cập nhật tin tức từ Mapei