Yard | Third Harbor Tunnel |
---|---|
Location | Boston, USA |
Subcategory | TUNNEL |
Built in | 1992 |
Opened in | 1997 |
Application | Tunnel covering with ceramic tiles |
Application Type | Installation of wall coverings |
Architects | Ing. Bob Vesey |
Here you can download all documents related to this project