Yard | terminal and air traffic control tower |
---|---|
Location | Isztambul, Turkey |
Subcategory | AIRPORT |
Built in | 2016 |
Opened in | 2028 |
Application | supply of products for substrate preparation, waterproofing surfaces in tanks and terraces, chemical anchoring, installing and grouting ceramic tiles, sealing joints, coating walls |
Start and finish date | 2016/2018 |
Application Type | Anchoring, Floor/wall covering, Waterproofing |
Client | IGA-Istanbul Great Airport |
Contractor company | CMLKK JV - Cengiz Mapa Limak Kolin Kalyon Joint Venture |
Installer companies | Umut Yalitim |
Architects | Nordic Office-Grimshaw-Haptic Architecture; Pininfarina-Aecom |
MAPEI Distributor | Umut, Himerpa, Pelenkoglu |
Project Manager | Horizontal |
MAPEI Coordination | Emrah Karatas, Mapei Yapi Kimyasallan A.S (Turkey) |
Here you can download all documents related to this project