Yard | UNESCO Heritage Building |
---|---|
Location | Wrocław, Poland |
Subcategory | CATHEDRAL |
Built in | 1911 |
Opened in | 1913 |
Application |
installation and treatment of wooden floors
The existing cement screed required filling and sanding to obtain a clean and adhesive substrate that only required local filling of cracks and removal of defects. 40 meters of cracks and fissures were filled with EPORIP TURBO. The remaining renovation of the substrate was carried out using PLANITOP 400. The finishing layer of the parquet was made using the ULTRACOAT varnish system. The oak parquet flooring was installed using ULTRABOND P902 2K, two-component epoxy-polyurethane adhesive, which allows for foot traffic after just 24 hours. The skirting boards were attached using ULTRABOND SUPER GRIP. The oak parquet was covered with a two-component primer in water dispersion, ULTRACOAT P920 2K. |
Start and finish date | 2011 |
Application Type | Products for wood flooring |
Client | City of Breslavia |
Installer companies | Centrum Parkietowe Nowak |
Architects | Max Berg |
MAPEI Distributor | Mapei Polska |
Project Manager | Daniel Nowak, Wojciech Sikora |
MAPEI Coordination | Wojciech Sikora, Mapei Polska |