Yard | highway tunnel |
---|---|
Location | Castiglione de Pepoli, Italy |
Subcategory | TUNNEL |
Built in | 2015 |
Opened in | 2016 |
Application | flexible thin ceramic tiles installation |
Application Type | Underground constructions |
Client | Autostrade per l’Italia Spa, Roma |
Contractor company | Pavimental |
Installer companies | Fasi di scavo e rivestimento Galleria di Base: Todini SpA (Roma); per la Galleria Sparvo: TOTO SpA (Chieti); Posa della lastra in gres porcellanato: Pavimental SpA (Roma) |
Specialists involved | Spea Engineering Spa, Roma |
Credits | Carla Bettoni; |
Project Manager | Spea Engineering Spa, Roma |
Here you can download all documents related to this project