Yarda | JW Marriott Miami |
---|---|
Ubicación | Miami, USA |
Subcategoría | HOTEL/INN |
Construido en | 2016 |
Abierto en | 2017 |
Aplicación | JW Marriott Miami |
Fecha de inicio y finalización | 2016/2017 |
Tipo de aplicación | Revestimientos de pared |
Propietario | Marriott International, Inc. |
Empresa contratista | Diversified Construction and Engineering |
Empresas instaladoras | Diversified Construction and Engineering |
Distribuidor de MAPEI | National Waterproofing Supply |
Créditos | Raul Ballester |
Gestor de proyectos | Emerson Barahona |
Coordinación de MAPEI | Carlos Hernandez |
Descripción | Concrete-restoration products and a decorative protective coating were required to give a facelift to the JW Marriott Miami hotel. The restoration of the facade included the removal and replacement of large areas of detached finish, additional crack repair to the surface and finishing of the facade with an Elastocolor® weatherproof decorative-coating system. |