Wind Generation Electricity Projects

Location icon Central Texas, USA
Ref #: 9999014
Category: PRODUCTION FACILITIES

Construction

Yard Wind Generation Electricity Projects
Location Central Texas, USA
Subcategory Power Plant
Application Wind Generation Electricity Projects
Application Type Admixtures for concrete, New building
Client Florida Power and Light
Contractor company D.H. Blattner and Sons
Other Ready Mix Supplier: Bauerly Brothers/Concrete Mobility Total Cubic Yards: 120,000 The concrete for the tower bases had a strength requirement of 5,000 to 6,000 psi in 28 days. High slump, high strength concrete was needed to place and consolidate the concrete with the large amount of steel reinforcement . The concrete also required extended slump life for the long haul to the project. The schedule dictated 1,500 – 2,000 cubic yards of concrete to be placed each day. This project was located in a remote region of central Texas which made delivery of materials a challenge. GRT dedicated two admixture trailers with full dispensing systems to service this project.

Product used for the project

Mapeplast 400 NC
Mapeplast 400 NC
Water-Reducing Admixture Mapeplast 400 NC (formerly Polychem 400 NC) is a…