Yard | Pinnacle Casino |
---|---|
Location | St. Louis, USA |
Subcategory | CASINO |
Application | Pinnacle Casino |
Application Type | New building, Admixtures for concrete |
Contractor company | McCarthy Building Companies |
Architects | Hellmuth, Obata + Kassabaum, Inc (HOK) |
Other | Concrete Contractor: Vee-Jay Cement Ready Mix Supplier: Metro Materials On the banks of the Mississippi, in the shadow of the famed Gateway Arch in St. Louis, MO the $350 million Pinnacle hotel, casino, parking garage and retail area was constructed. The schedule required high performance concrete throughout the project. The mixes varied from post tension parking decks, architectural finished form work to high strength columns and foundations. GRT’s chemical admixtures were used throughout the project to provide the necessary concrete performance needed during the cold winter conditions to the hot summer conditions in St. Louis. |