Eastwood Towne Center Parking Garage

Location icon Lansing, USA
Ref #: 9999002
Category: COMMERCIAL

Construction

Yard Eastwood Towne Center Parking Garage
Location Lansing, USA
Subcategory PARKING
Built in 2011
Opened in 2012
Application Eastwood Towne Center Parking Garage
Application Type New building, Admixtures for concrete
Client City of Lansing
Contractor company Grand River Construction Inc.
Installer companies High Grade Materials
Architects Desman Associates
Other Supplier: High Grade Materials Currently the city of Lansing, Michigan’s largest concrete building project. This is a $103 million class “A” leed?, cast-in-place, post-tension parking deck. The project required 10,000 cy of high strength, high performance concrete; including PT strengths of over 3,500 psi overnight in all conditions with ultimate strengths of 9,000 psi, architectural finished formwork, high strength columns and parking decks that can endure harsh winter conditions.

Product used for the project

Mapetard R
Mapetard R
Set-Retarding Admixture for Concrete Mapetard R (formerly Polychem R) is a…
3007920 - Polychem SA-50
Polychem SA-50
Product not available for this market,
contact us
3007930 - Polychem SPC
Polychem SPC
Product not available for this market,
contact us

Keep in touch

Subscribe to our newsletter to get Mapei news