Solid vinyl flooring for new concrete with high moisture

Residential high-rises
Internal flooring; Floor slab
New construction; Installation of resilient flooring

Challenges: HVAC not operating; leveling required; high-moisture substrate conditions

Solutions: Moisture-resistant skimcoating or patching compounds; moisture-tolerant adhesives

Application steps

1
Concrete
2
Patching compound and skimcoat
3
Resilient-flooring adhesive
4

Solid vinyl flooring

5
Caulk

Headphones iconDo you need help? Contact us

NOT REMOVE

Keep in touch

Subscribe to our newsletter to get Mapei news