Yard | tunnel |
---|---|
Location | San Giorgio Canavese, Italy |
Subcategory | TUNNEL |
Built in | 2012 |
Opened in | 2012 |
Application | repair of interior walls and coatings |
Application Type | Concrete restoration |
Client | Attiva |
Contractor company | Asfalt CCP |
Installer companies | Water Costruzioni |
Architects | Attiva Engineering |
Credits | Bruno Zamorani |
Project Manager | ing. Cerruti |