Yard | Inside. |
---|---|
Location | Turkey |
Subcategory | STORE HOUSE |
Built in | 2022 |
Opened in | 2022 |
Application |
Cementitious flooring
After necessary substrate preparation and repair works of the concrete floors of PEPSICO İstanbul Europe Warehouse were completed, epoxy based primer PRIMER SN was applied which was then followed by the application of the cementitious based industrial flooring ULTRATOP. Final step was the application of MAPECOAT STAIN PROTECTION as the protective top coat over ULTRATOP. |
Start and finish date | 2022 |
Application Type | Floor/wall covering |
Contractor company | Açısal İnşaat |
Installer companies | Poseidon Mühendislik |
Project Manager | Halil Yuşa Yağcı |