Yard | increase the concrete cover by jacketing the defective piers |
---|---|
Location | AUckland, New Zealand |
Subcategory | SHIPPING DOCK |
Application |
increase the concrete cover by jacketing the defective piers
To improve durability of the Half Moon Bay Ferry Pier, Auckland, it was decided to increase the concrete cover by jacketing the defective piers with a 50mm thick layer of micro-concrete. Mapefill MC06 was chosen as the preferred product. |
Application Type | Concrete restoration |
Contractor company | Downer NZ Limited |
Other | Auckland Transport |