Yard | 80.000 square meters floors of carpark |
---|---|
Location | Пекін, China |
Subcategory | PARKING |
Built in | 2017 |
Opened in | 2019 |
Application | supplying products to lay cementitious floors in the carpark of the west wing |
Start and finish date | 2019 |
Application Type | Cemetitious and resin floor coverings |
Client | Shouzhong Investment Management Co. Ltd |
Contractor company | China Construction Eighth Engineering Bureau |
Installer companies | Henan Jian’An Waterproof and Anticorrosive Engineering Co.,Ltd |
Specialists involved | Joint Design Team including Zaha Hadid Architects, ADP Ingénierie (ADPI), BIAD (Beijing Institute of Architectural Design) and CACC (China Airport Construction Group Corporation), Beijing Architectural Design and Research Institute |
MAPEI Coordination | Guo Ming, Mapei Construction Materials (Guangzhou) Co. Ltd. |
Here you can download all documents related to this project