Dvorišče | terminal and air traffic control tower |
---|---|
Položaj | Isztambul, Turkey |
Podkategorija | AIRPORT |
Vgrajeno | 2016 |
Otvoritev | 2028 |
Vrsta uporabe | supply of products for substrate preparation, waterproofing surfaces in tanks and terraces, chemical anchoring, installing and grouting ceramic tiles, sealing joints, coating walls |
Datum začetka in konca | 2016/2018 |
Vrsta uporabe | Pritrditev, Vgradnja talnih in stenski oblog, Hidroizolacija |
Lastnik | IGA-Istanbul Great Airport |
Izvajalsko podjetje | CMLKK JV - Cengiz Mapa Limak Kolin Kalyon Joint Venture |
Inštalacijska podjetja | Umut Yalitim |
Arhitekti | Nordic Office-Grimshaw-Haptic Architecture; Pininfarina-Aecom |
Distributer MAPEI | Umut, Himerpa, Pelenkoglu |
Project Manager | Horizontal |
Koordinacija MAPEI | Emrah Karatas, Mapei Yapi Kimyasallan A.S (Turkey) |
Tu lahko prenesete vse dokumente, povezane s tem projektom