Klang Valley Mass Rapid Transit (KVMRT)

Location icon Malaysia
Ref. št.: 60000032
Kategorija: INFRASTRUKTURA

Gradbeništvo

Dvorišče Klang Valley Mass Rapid Transit (KVMRT)
Položaj Malaysia
Podkategorija METRO
Vgrajeno 2013
Otvoritev 2014
Vrsta uporabe Klang Valley Mass Rapid Transit (KVMRT) - Bukit Bintang Central Underground Station
Datum začetka in konca 2013/2014
Vrsta uporabe Hidroizolacija
Lastnik Mass Rapid Transit Corporation Sdn Bhd
Izvajalsko podjetje MMC Gamuda KVMRT (T) Sdn Bhd
Inštalacijska podjetja CRT Specialist (M) Sdn Bhd
Arhitekti Mott MacDonald (M) Sdn Bhd (Engineers)
Distributer MAPEI Mapei Malaysia Sdn Bhd
Opis The Bukit Bintang Central station is constructed using the “cut-and-cover” method with a total excavation depth of 33m. It has a footprint of 150m x 19.0m with depths of 16.9m from existing ground level to the top of rail level for the upper platform and 30.4m to the top of rail level for the lower platform. The station consists of four levels namely concourse, upper platform, plant-room platform and lower platform. The main contractor wanted a durable, high-performance waterproofing system, "MAPEI Purtop" for the roof slab to provide long-term, low-maintenance protection against water ingress. (The walls were protected using a drainage system.)

Za projekt uporabljeni izdelek

BIBLOCK
BIBLOCK
Dvokomponentni, epoksidni premaz v vodni disperziji za nego svežih betonskih…
PRIMER SN
PRIMER SN
Dvokomponentni, epoksidni premaz s polnili brez organskih topil za…
434 - IDROSTOP SW
IDROSTOP SW
Product not avalaible for this market,
contact us
943 - IDROSTOP TUBOFLEX
IDROSTOP TUBOFLEX
Product not avalaible for this market,
contact us
2299 - MAPEGEL UTT SYSTEM
MAPEGEL UTT SYSTEM
Product not avalaible for this market,
contact us
2126 - PURTOP 1000
PURTOP 1000
Product not avalaible for this market,
contact us

Ostanite v stiku z nami

Tukaj se lahko naročite na Mapei novičnik in prejemate naše novice