Rothorn Sörenberg

Location icon Sörenberg, Switzerland
The rock, especially in the last third towards Eisee, is cleaned in the first phase and loose areas are removed. The rock is sealed with a layer of shotcrete so that no more stones can fall down. At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting. This prevents ice from forming overhead and ensures the safety of winter sports enthusiasts.
Ref. št.: 4658
Kategorija: INFRASTRUKTURA

Gradbeništvo

Dvorišče ceiling of the passage tunnel
Položaj Sörenberg, Switzerland
Podkategorija TUNNEL
Vrsta uporabe At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting.
Datum začetka in konca 2023
Vrsta uporabe Podzemne konstrukcije
Inštalacijska podjetja Gasser Felstechnik AG, Lungern
Vodja projekta Rothornbahn Sörenberg
Točke Ramon Lehmann Fotografie
Koordinacija MAPEI Urs Wirth

Za projekt uporabljeni izdelek

LAMPOCEM Blitzzement
LAMPOCEM Blitzzement
Product not avalaible for this market,
contact us
MAPELASTIC TU SYSTEM
MAPELASTIC TU SYSTEM
Product not avalaible for this market,
contact us
MAPEQUICK AF 300 DRY
MAPEQUICK AF 300 DRY
Product not avalaible for this market,
contact us

Ostanite v stiku z nami

Tukaj se lahko naročite na Mapei novičnik in prejemate naše novice