Sabah Ammonia Urea Plant

Location icon Sipitang, Malaysia
Ref #: 60000036
Category: PRODUCTION AND SERVICES

Construction

Yard Sabah Ammonia Urea Plant
Location Sipitang, Malaysia
Subcategory PLANT
Built in 2014
Opened in 2015
Application Tank Lining & Waterproofing
Application Type Waterproofing systems
Client Petronas Chemicals Group Berhad
Contractor company Mitsubishi Heavy Industries / Apex Energy Sdn Bhd / PT Rekayasa Industri Consortium
Installer companies Hycrete Mecure Sdn Bhd
Architects Architect HaoYun
MAPEI Distributor Mapei Malaysia Sdn Bhd
Other Construction of Petronas Chemicals Group Bhd’s Ammonia Urea Complex in Sipitang- Sabah started in mid-2012. The RM5 billion BEPCC contract – Basic and Detailed Engineering, Procurement, Construction and Commissioning – was undertaken by a consortium comprising Mitsubishi Heavy Industries, Apex Energy Sdn Bhd and PT Rekayasa Industri.

The SAMUR Project involves the development of a new fertiliser plant with urea production capacity of 1.2 million metric tons per annum (mmtpa). The plant will be located on 166 acres of land in the Sipitang Industrial Park, Sabah.

Also known as the SAMUR Project, the complex located in the Sipitang Oil & Gas Industrial Park comprises an ammonia plant, a urea plant, a granulation plant, integrated utility units and jetty facilities.

Completion is scheduled for February, 2016.

Besides waterproofing for the roof slab, a highly chemical-resistant and abrasion-resistant lining was required for the ammonia processing plant’s cooling tower.

Mapei Products: PRIMER SN, MAPECOAT VE825 AP, MAPETEX GRP225, PLASTIMUL MY, MAPETHENE TA 3MM

Product used for the project

MAPETEX GRP 225
MAPETEX GRP 225
Mapetex GRP 225 is a mat made of chopped fiberglass strands, randomly…
PLASTIMUL MY
PLASTIMUL MY
All-purpose, bituminous emulsion coating TECHNICAL CHARACTERISTICS Plastimul MY…
PRIMER SN
PRIMER SN
Two-component epoxy primer with fillers. May be coloured with MAPECOLOR PASTE.…

Keep in touch

Subscribe to our newsletter to get Mapei news