Yard | double road bridge |
---|---|
Location | Bucharest, Romania |
Subcategory | BRIDGE |
Built in | 2010 |
Opened in | 2014 |
Application | application of anti-carbonation protection coat |
Start and finish date | 2014 |
Application Type | Facade interventions |
Client | BUCHAREST CITY HALL |
Contractor company | ASTALDI SPA |
Installer companies | ASTALDI SPA |
MAPEI Distributor | ASTALDI SPA |
Other | Two parallel passages for each sense, one with a length of 675.4 meters and the second with a length of 687.7 meters. The width of the two bridges is 7.8 meters. The contribution of MAPEI was to protect concrete structures against carbonation using the mos |