Yard | Industry realization |
---|---|
Location | Sternatia, Italy |
Subcategory | INDUSTRY |
Built in | 2002 |
Opened in | 2003 |
Application | Prefabricated concrete structures production |
Application Type | Admixtures for concrete |
Project Manager | Arch. Calogiuri giuseppe |