Yard | PRODUCTION PLANT |
---|---|
Location | Wilkowice, Poland |
Subcategory | INDUSTRY |
Built in | 2016 |
Opened in | 2018 |
Application | MAPEI provided products for 2000 m2 of electrically conductive flooring (MAPEFLOOR I 360 AS, PRIMER W – AS) installed in production section and 6000 m2 of industrial resin flooring (MAPEFLOOR I 300 SL) installed in assembly section. |
Start and finish date | 2017/2018 |
Application Type | Installation of floors |
Client | ASK AUTOMOTIVE INDUSTRIES GROUP POLAND Bielsko-Biala |
Contractor company | P.A. NOVA Gliwice |
Installer companies | PROMIS Kraczkowa |
Architects | Tomasz Walszek |
Credits | Konrad Makar |
MAPEI Coordination | Piotr Góra |