Exception occured while executing the controller. Check error logs for details.

Bridge constructed by casting piles in-situ and assembling the pre-cast structures

Infrastructures
Viaduct/Bridge
New construction

Application steps

1
Reinforced concrete pile
2
Superplasicizer 
range Dynamon SR / SX or / Chronos
3
Pre-cast slabs
range Dynamon NRG
4
Predalles
range Dynamon SR / SX
5
Non-shrink concrete
Mapecrete System
Dynamon SR / SX +
MAPECURE SRA 25 +
EXPANCRETE
6
Form release agent for shot concrete
7
Solvent-based primer
8
Protective elastomeric paint
You may be interested in New construction
NOT REMOVE

Keep in touch

Subscribe to our newsletter to get Mapei news