Two-component, super-fluid epoxy resin for impregnating MAPEWRAP using the “damp system”. TECHNICAL DATA: Mixing ratio: comp. A : comp. B = 4 : 1. Workability time: 40 minutes (at +23°C). Bond strength to concrete: > 3 N/mm² (after 7 days at +23°C - failure of substrate). Brookfield Viscosity: 300 mPa•s (rotor 1 - 10 revs). Classification: EN 1504-4. Consumption: according to the type and width of the fabric. Packaging: 5 kg kits: