Rothorn Sörenberg

Location icon Sörenberg, Schweiz
The rock, especially in the last third towards Eisee, is cleaned in the first phase and loose areas are removed. The rock is sealed with a layer of shotcrete so that no more stones can fall down. At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting. This prevents ice from forming overhead and ensures the safety of winter sports enthusiasts.
Referens nr : 4658
Kategori: INFRASTRUKTUR

Bygg

Konstruktionstyp ceiling of the passage tunnel
Plats Sörenberg, Schweiz
Typ av byggnad/anläggning TUNNEL
Tillämpning At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting.
Start- och slutdatum 2023
Typ av tillämpning Underjordskonstruktioner/tunnel och gruvindustri
Installationsföretag Gasser Felstechnik AG, Lungern
Projektledare Rothornbahn Sörenberg
Foto Ramon Lehmann Fotografie
MAPEI-samordnare Urs Wirth

Produkt som använts i projektet

MAPELASTIC TU SYSTEM
MAPELASTIC TU SYSTEM
Enkomponents, sprutbart membran för vattentätning av alla slags bärande…
LAMPOCEM Blitzzement
LAMPOCEM Blitzzement
Product not available for this market,
contact us
MAPEQUICK AF 300 DRY
MAPEQUICK AF 300 DRY
Product not available for this market,
contact us

Håll kontakten

Prenumerera på vårt nyhetsbrev för att få nyheter från Mapei