Konstruktionstyp | The existing gallery was extended by 320 metres with the new building. |
---|---|
Plats | Disentis, Schweiz |
Typ av byggnad/anläggning | TUNNEL |
Tillämpning | By extending the avalanche gallery, the average duration of closures of the Lukmanier road can be reduced from 37 days today to 19 days in the future. A total of 9 400 m³ of Dynamon SR 912 CH was used. |
Start- och slutdatum | 2021 |
Typ av tillämpning | Väg/infrastruktur |
Installationsföretag | Matteo Muttoni Costruzioni SA, Via Murate 6, 6500 Bellinzona |
Projektledare | Kanton Graubünden |
MAPEI-samordnare | Marco Jungi |