Klang Valley Mass Rapid Transit (KVMRT)

Location icon Malezija
Ref #: 60000032
Segment: Infrastruktura

Izgradnja

Područje primene Klang Valley Mass Rapid Transit (KVMRT)
Lokacija Malezija
Kategorija objekta METRO
Godina izgradnje 2013
Otvoren 2014
Radovi izvedeni Mapei materijalima Klang Valley Mass Rapid Transit (KVMRT) - Bukit Bintang Central Underground Station
Vreme izvođenja radova 2013/2014
Vrsta radova Hidroizolacije
Investitor Mass Rapid Transit Corporation Sdn Bhd
Glavni izvođač MMC Gamuda KVMRT (T) Sdn Bhd
Podizvođač CRT Specialist (M) Sdn Bhd
Odgovorni projektant Mott MacDonald (M) Sdn Bhd (Engineers)
MAPEI distributer Mapei Malaysia Sdn Bhd
Opis The Bukit Bintang Central station is constructed using the “cut-and-cover” method with a total excavation depth of 33m. It has a footprint of 150m x 19.0m with depths of 16.9m from existing ground level to the top of rail level for the upper platform and 30.4m to the top of rail level for the lower platform. The station consists of four levels namely concourse, upper platform, plant-room platform and lower platform. The main contractor wanted a durable, high-performance waterproofing system, "MAPEI Purtop" for the roof slab to provide long-term, low-maintenance protection against water ingress. (The walls were protected using a drainage system.)

Proizvod upotrebljen na projektu

BIBLOCK
BIBLOCK
Dvokomponentni epoksidni proizvod u vodenoj disperziji namenjen…
PRIMER SN
PRIMER SN
Dvokomponentni epoksidni prianjanjući premaz sa puniocima. Može se tonirati…
PURTOP 1000
PURTOP 1000
Dvokomponentna hidroizolaciona membrana od čiste poliuree, bez rastvarača, za…
434 - IDROSTOP SW
IDROSTOP SW
Product not avalaible for this market,
contact us
943 - IDROSTOP TUBOFLEX
IDROSTOP TUBOFLEX
Product not avalaible for this market,
contact us
2299 - MAPEGEL UTT SYSTEM
MAPEGEL UTT SYSTEM
Product not avalaible for this market,
contact us

Ostanite s nama u kontaktu

Prijavite se za naš bilten, kako biste dobijali Mapei novosti