Područje primene | The new linoleum floor of the hotel rooms at Hotel du Barrage was installed with Ultrabond Eco 530. |
---|---|
Lokacija | Hérémence, Švajcarska |
Kategorija objekta | HOTEL |
Radovi izvedeni Mapei materijalima | The old coverings were torn off, the substrates sanded and primed with Eco Prim Grip Plus. |
Vreme izvođenja radova | 2022 |
Vrsta radova | Podne/zidne obloge |
Odgovorni projektant | Mijong Architecture Design |
Projektant | Grande Dixence SA |
Mapei koordinatori | Marcello Maieron |