CASA HABITACION de valor histórico en Guanajuato

Location icon Meksiko
The house is a semi-urban agricultural structure that was transformed into the Neoclassical style in the 1850s. Stone from the region was used in the building, and the floors and ornamental elements of the structure give the house warmness and elegance.
Ref #: 103
Segment: Stambeni objekti

Izgradnja

Područje primene Stone floor, Wall covering, Wall lime paint
Lokacija Meksiko
Kategorija objekta PORODIČNA KUĆA
Godina izgradnje 1850
Otvoren 1850
Radovi izvedeni Mapei materijalima The house is a semi-urban agricultural structure that was transformed into the Neoclassical style in the 1850s. Stone from the region was used in the building, and the floors and ornamental elements of the structure give the house warmness and elegance.
The house is a semi-urban agricultural structure that was transformed into the Neoclassical style in the 1850s. Stone from the region was used in the building, and the floors and ornamental elements of the structure give the house warmness and elegance. After removing the old and damaged flattening, the following process was the consolidation of the joints in the masonry with Vitruvio Repello. The next step was the anchoring flattening with Vitruvio Repello Base at 1.5 cm thickness. The second layer was placed with Vitruvio Fine Finish at 1.5 cm thickness. Finally, the Silancolor System was applied: Primer, Base and White Paint. Only Mapei lime base products, and the MapeAntique line were applied. It is important to highlight the care installation on the volcanic stone, tezontle, and clay floor coverings. In fact, there was a previous selection of these floor coverings considering their brightness and intensity of color to combine them properly with the natural stones. Project information Period of construction: Three courtyards one for each century XVIII, XIX y XX Year of MAPEI involvement: 2018-2021 MAPEI Coordinator: Max Alvarez & Carlos Terrazas Project Owner: María Soledad Hernández Ruiz MAPEI Distributors: María del Carmen Pérez Díaz Architect: Hectór Manuel Mosqueda Hernández General Contractor: Intersección Arquitectos, S.A. de C.V. Photographer: Sergio Zárate Project size: approx. 850 m
Vreme izvođenja radova 2018/2021
Vrsta radova Ugradnja podnih i zidnih obloga, Polaganje podnih obloga, Sanacija zidanih konstrukcija, Tile & stone installation systems
Investitor María Soledad Hernández Ruiz
Glavni izvođač Intersección Arquitectos, S.A. de C.V.
MAPEI distributer María del Carmen Pérez Díaz
Fotografije Sergio Zárate
Project Manager Hectór Manuel Mosqueda Hernández
Mapei koordinatori Max Alvarez & Carlos Terrazas
Poveži sa detaljima https://youtu.be/Ek1b_R8t8YI

Ostali prilozi

Ovde možete preuzeti sve dokumente vezane za ovaj projekat

Ostanite s nama u kontaktu

Prijavite se za naš bilten, kako biste dobijali Mapei novosti