Rothorn Sörenberg

Location icon Sörenberg, Švajcarska
The rock, especially in the last third towards Eisee, is cleaned in the first phase and loose areas are removed. The rock is sealed with a layer of shotcrete so that no more stones can fall down. At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting. This prevents ice from forming overhead and ensures the safety of winter sports enthusiasts.
Ref #: 4658
Segment: Infrastruktura

Izgradnja

Područje primene ceiling of the passage tunnel
Lokacija Sörenberg, Švajcarska
Kategorija objekta TUNEL
Radovi izvedeni Mapei materijalima At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting.
Vreme izvođenja radova 2023
Vrsta radova Podzemne konstrukcije
Podizvođač Gasser Felstechnik AG, Lungern
Projektant Rothornbahn Sörenberg
Fotografije Ramon Lehmann Fotografie
Mapei koordinatori Urs Wirth

Proizvod upotrebljen na projektu

LAMPOCEM Blitzzement
LAMPOCEM Blitzzement
Product not avalaible for this market,
contact us
MAPELASTIC TU SYSTEM
MAPELASTIC TU SYSTEM
Product not avalaible for this market,
contact us
MAPEQUICK AF 300 DRY
MAPEQUICK AF 300 DRY
Product not avalaible for this market,
contact us

Ostanite s nama u kontaktu

Prijavite se za naš bilten, kako biste dobijali Mapei novosti