Yard | Wanchai |
---|---|
Locație | Hong Kong |
Sub-categorie | TUNEL |
Aplicație | Waterproofing (8,000 m2) |
Data de început și de finalizare | 2014/2016 |
Tipul aplicației | Constructii subterane |
Deținător | Civil Engineering & Development Department, HKSAR |
Societate contractantă | Chun Wo - Leader Joint Venture |
Societăți de instalare | Hop Shing Waterproof Construction Co. Ltd. |
Arhitecți | AECOM Asia Co. Ltd. |
Distribuitor MAPEI | Mapei China Ltd. |
Descriere | Along the coastline at Wan Chai North and North Point, the cut and cover tunnel was built and it needs a high-performance waterproofing system to ensure a safe and efficient transport facilities to public. Purtop 400M HK was proposed to protect the 8,000 sq.m tunnel from any leakages. |