Sabah Ammonia Urea Plant

Location icon Sipitang, Malaysia
Ref #: 60000036
Categoria: INDÚSTRIA

Construção

Obra Sabah Ammonia Urea Plant
Localização Sipitang, Malaysia
Subcategoria FÁBRICA
Construído em 2014
Inaugurado em 2015
Aplicação Tank Lining & Waterproofing
Tipo de aplicação Impermeabilização
Proprietário Petronas Chemicals Group Berhad
Empreteiro Mitsubishi Heavy Industries / Apex Energy Sdn Bhd / PT Rekayasa Industri Consortium
Aplicador Hycrete Mecure Sdn Bhd
Arquitetos Architect HaoYun
Distribuidor MAPEI Mapei Malaysia Sdn Bhd
Descrição Construction of Petronas Chemicals Group Bhd’s Ammonia Urea Complex in Sipitang- Sabah started in mid-2012. The RM5 billion BEPCC contract – Basic and Detailed Engineering, Procurement, Construction and Commissioning – was undertaken by a consortium comprising Mitsubishi Heavy Industries, Apex Energy Sdn Bhd and PT Rekayasa Industri.

The SAMUR Project involves the development of a new fertiliser plant with urea production capacity of 1.2 million metric tons per annum (mmtpa). The plant will be located on 166 acres of land in the Sipitang Industrial Park, Sabah.

Also known as the SAMUR Project, the complex located in the Sipitang Oil & Gas Industrial Park comprises an ammonia plant, a urea plant, a granulation plant, integrated utility units and jetty facilities.

Completion is scheduled for February, 2016.

Besides waterproofing for the roof slab, a highly chemical-resistant and abrasion-resistant lining was required for the ammonia processing plant’s cooling tower.

Mapei Products: PRIMER SN, MAPECOAT VE825 AP, MAPETEX GRP225, PLASTIMUL MY, MAPETHENE TA 3MM

Produtos utilizados no projeto

PRIMER SN
PRIMER SN
Primer epóxi bicomponente com filler, em conformidade com as normas de…

Mantenha-se em contacto

Subscreva a nossa newsletter para receber notícias da Mapei