Klang Valley Mass Rapid Transit (KVMRT)

Location icon Malaysia
Ref #: 60000032
Categoria: INFRAESTRUTURAS

Construção

Obra Klang Valley Mass Rapid Transit (KVMRT)
Localização Malaysia
Subcategoria METRO
Construído em 2013
Inaugurado em 2014
Aplicação Klang Valley Mass Rapid Transit (KVMRT) - Bukit Bintang Central Underground Station
Data de início e fim 2013/2014
Tipo de aplicação Impermeabilização
Proprietário Mass Rapid Transit Corporation Sdn Bhd
Empreteiro MMC Gamuda KVMRT (T) Sdn Bhd
Aplicador CRT Specialist (M) Sdn Bhd
Arquitetos Mott MacDonald (M) Sdn Bhd (Engineers)
Distribuidor MAPEI Mapei Malaysia Sdn Bhd
Descrição The Bukit Bintang Central station is constructed using the “cut-and-cover” method with a total excavation depth of 33m. It has a footprint of 150m x 19.0m with depths of 16.9m
from existing ground level to the top of rail level for the upper platform and 30.4m to the top of rail level for the lower platform.
The station consists of four levels namely concourse, upper platform, plant-room platform and lower platform.
The main contractor wanted a durable, high-performance waterproofing system, "MAPEI Purtop" for the roof slab to provide long-term, low-maintenance protection against water ingress. (The walls were protected using a drainage system.)

Produtos utilizados no projeto

BIBLOCK
BIBLOCK
Primário epoxídico bicomponente em dispersão aquosa para betão com propriedades…
PRIMER SN
PRIMER SN
Primer epóxi bicomponente com filler, em conformidade com as normas de…
2299 - MAPEGEL UTT SYSTEM
MAPEGEL UTT SYSTEM
Product not available for this market,
contact us
2126 - PURTOP 1000
PURTOP 1000
Product not available for this market,
contact us

Mantenha-se em contacto

Subscreva a nossa newsletter para receber notícias da Mapei