Obra | The new linoleum floor of the hotel rooms at Hotel du Barrage was installed with Ultrabond Eco 530. |
---|---|
Localização | Hérémence, Switzerland |
Subcategoria | HOTEL |
Aplicação | The old coverings were torn off, the substrates sanded and primed with Eco Prim Grip Plus. |
Data de início e fim | 2022 |
Tipo de aplicação | Pavimentos/revestimentos |
Arquitetos | Mijong Architecture Design |
Project Manager | Grande Dixence SA |
Coordenação MAPEI | Marcello Maieron |
Subscreva a nossa newsletter para receber notícias da Mapei