Obra | The existing gallery was extended by 320 metres with the new building. |
---|---|
Localização | Disentis, Switzerland |
Subcategoria | TÚNEL |
Aplicação | By extending the avalanche gallery, the average duration of closures of the Lukmanier road can be reduced from 37 days today to 19 days in the future. A total of 9 400 m³ of Dynamon SR 912 CH was used. |
Data de início e fim | 2021 |
Tipo de aplicação | Rodoviária |
Aplicador | Matteo Muttoni Costruzioni SA, Via Murate 6, 6500 Bellinzona |
Project Manager | Kanton Graubünden |
Coordenação MAPEI | Marco Jungi |
Subscreva a nossa newsletter para receber notícias da Mapei