Obra | road tunnel, safety tunnel |
---|---|
Localização | Noiraigue, Switzerland |
Subcategoria | TÚNEL |
Aplicação |
After 50 years of service, the 1 km long Tunnel de la Clusette no longer met the required safety standards.
It was repaired with our sealing products. The project essentially comprises the renovation of the existing tunnel and the construction of a safety tunnel parallel to the road tunnel, which will enable the tunnel to be evacuated in the event of a fire. It should also be possible to use the safety tunnel as a pedestrian and cycling path. |
Data de início e fim | 2022/2026 |
Tipo de aplicação | Construção subterrânea |
Aplicador | Renesco AG, Moosseedorf |
Arquitetos | Groupement BG ingénieurs conseils SA, Marin-Epagnier | OPAN concept SA, Neuchâtel |
Project Manager | Canton Neuchâtel |
Coordenação MAPEI | Stefan Niederberger |
Subscreva a nossa newsletter para receber notícias da Mapei