Rothorn Sörenberg

Location icon Sörenberg, Switzerland
The rock, especially in the last third towards Eisee, is cleaned in the first phase and loose areas are removed. The rock is sealed with a layer of shotcrete so that no more stones can fall down. At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting. This prevents ice from forming overhead and ensures the safety of winter sports enthusiasts.
Ref #: 4658
Categoria: INFRAESTRUTURAS

Construção

Obra ceiling of the passage tunnel
Localização Sörenberg, Switzerland
Subcategoria TÚNEL
Aplicação At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting.
Data de início e fim 2023
Tipo de aplicação Construção subterrânea
Aplicador Gasser Felstechnik AG, Lungern
Project Manager Rothornbahn Sörenberg
Créditos Ramon Lehmann Fotografie
Coordenação MAPEI Urs Wirth

Produtos utilizados no projeto

LAMPOCEM Blitzzement
LAMPOCEM Blitzzement
Product not available for this market,
contact us
MAPELASTIC TU SYSTEM
MAPELASTIC TU SYSTEM
Product not available for this market,
contact us
MAPEQUICK AF 300 DRY
MAPEQUICK AF 300 DRY
Product not available for this market,
contact us

Mantenha-se em contacto

Subscreva a nossa newsletter para receber notícias da Mapei