Yarda | Miami Cancer Institute at Baptist Health South Florida |
---|---|
Ubicación | Miami, USA |
Subcategoría | HOSPITAL |
Construido en | 2016 |
Abierto en | 2016 |
Aplicación | Miami Cancer Institute at Baptist Health South Florida |
Fecha de inicio y finalización | 2016 |
Tipo de aplicación | Revestimiento de piso/pared |
Propietario | Baptist Health South Florida |
Empresa contratista | Robins & Morton |
Empresas instaladoras | David Allen Company |
Arquitectos | MGE Architects |
Distribuidor de MAPEI | Daltile (Pompano Beach, FL) |
Créditos | Raul Ballester |
Gestor de proyectos | Angel Vasquez |
Coordinación de MAPEI | Dario Di Geso, Scott Benavent |
Descripción | A full system of MAPEI products – including surface preparation products and sound-control membranes, mortars and grouts – was used to construct the $430 million Miami Cancer Institute at Baptist Health South Florida. |