Rothorn Sörenberg

Location icon Sörenberg, Switzerland
The rock, especially in the last third towards Eisee, is cleaned in the first phase and loose areas are removed. The rock is sealed with a layer of shotcrete so that no more stones can fall down. At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting. This prevents ice from forming overhead and ensures the safety of winter sports enthusiasts.
N.º de ref.: 4658
Categoría: INFRAESTRUCTURAS

Construcción

Yarda ceiling of the passage tunnel
Ubicación Sörenberg, Switzerland
Subcategoría TUNNEL
Aplicación At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting.
Fecha de inicio y finalización 2023
Tipo de aplicación Construcción subterránea
Empresas instaladoras Gasser Felstechnik AG, Lungern
Gestor de proyectos Rothornbahn Sörenberg
Créditos Ramon Lehmann Fotografie
Coordinación de MAPEI Urs Wirth

Producto usado en el proyecto

LAMPOCEM Blitzzement
LAMPOCEM Blitzzement
Product not available for this market,
contact us
MAPELASTIC TU SYSTEM
MAPELASTIC TU SYSTEM
Product not available for this market,
contact us
MAPEQUICK AF 300 DRY
MAPEQUICK AF 300 DRY
Product not available for this market,
contact us

Keep in touch

Subscribe to our newsletter to get Mapei news