Yarda | Eastwood Towne Center Parking Garage |
---|---|
Ubicación | Lansing, USA |
Subcategoría | PARKING |
Construido en | 2011 |
Abierto en | 2012 |
Aplicación | Eastwood Towne Center Parking Garage |
Tipo de aplicación | Nuevo edificio, Aditivos para concreto |
Propietario | City of Lansing |
Empresa contratista | Grand River Construction Inc. |
Empresas instaladoras | High Grade Materials |
Arquitectos | Desman Associates |
Descripción |
Supplier: High Grade Materials Currently the city of Lansing, Michigan’s largest concrete building project. This is a $103 million class “A” leed?, cast-in-place, post-tension parking deck. The project required 10,000 cy of high strength, high performance concrete; including PT strengths of over 3,500 psi overnight in all conditions with ultimate strengths of 9,000 psi, architectural finished formwork, high strength columns and parking decks that can endure harsh winter conditions. |