Yard | Epoxy flooring system, Tile adhesive and Grout, Floor Screed |
---|---|
Location | Dubai, United Arab Emirates |
Subcategory | MUSEUM |
Built in | 2022 |
Opened in | 2022 |
Application |
Interior and Exterior works
3D Wall brick application in the Reception Area and Tiling work - Bathroom and Common Areas. |
Start and finish date | 2019/2021 |
Application Type | Floor/wall coverings |
Contractor company | BAM INTERNATIONAL |
Installer companies | DEEMAH STONE |
Architects | AECOM AND KILLA DESIGN |