MAPEI and Three Rivers Protection & Overflow Reduction Tunnel (3RPORT)

Location icon Fort Wayne, USA
Ref #: 234234
Category: INFRASTRUCTURES

Construction

Yard The tunnel has a length of 24.5 feet (7.48 m)
Location Fort Wayne, USA
Subcategory TUNNEL
Built in 2018
Opened in 2021
Application MAPEI’s Underground Tunnel Team (UTT) of experts helped with the tunneling operations and concrete repairs for the overflow of sewage and the cleanup of Fort Wayne’s rivers.
Start and finish date 2018/2022
Application Type Underground construction, Roading
Client City of Fort Wayne, Indiana
Contractor company Salini-Lane Healy
MAPEI Coordination James Pinkley, Dr. Cristina Oñate and Tanner Murt

Additional Attachments

Here you can download all documents related to this project

Product used for the project

Epojet LV [NA]
Epojet LV [NA]
Very Low-Viscosity, Epoxy Injection Resin for Crack Repair Epojet LV [NA] is a…
Mapecure DR and Mapecure DR 1D
Mapecure DR and Mapecure DR 1D
Water-Based, Dissipating-Resin Curing Compounds Mapecure DR and Mapecure DR 1D…
Planitop 12 SR
Planitop 12 SR
Sulfate-Resistant, Vertical, Overhead and Horizontal Repair Mortar with Silica…
Planitop 18
Planitop 18
Very Rapid-Hardening Repair Mortar Planitop 18 is a very rapid-hardening…
Resfoam SS 75
Resfoam SS 75
Rigid, Hydrophobic Polyurethane Grout for Soil Stabilization Resfoam SS 75 is…

Keep in touch

Subscribe to our newsletter to get Mapei news