Yard | The new linoleum floor of the hotel rooms at Hotel du Barrage was installed with Ultrabond Eco 530. |
---|---|
Location | Hérémence, Switzerland |
Subcategory | HOTEL/INN |
Application | The old coverings were torn off, the substrates sanded and primed with Eco Prim Grip Plus. |
Start and finish date | 2022 |
Application Type | Floor/wall coverings |
Architects | Mijong Architecture Design |
Specialists involved | Grande Dixence SA |
MAPEI Coordination | Marcello Maieron |