Brickell Key Bridge

Location icon Miami, USA
Ref #: 200511
Category: INFRASTRUCTURES

Construction

Yard 247 meters link bridge
Location Miami, USA
Subcategory BRIDGE
Built in 1947
Opened in 1947
Application supply of products for concrete pillars and road repair
Start and finish date 2010/2011
Application Type Concrete restoration
Client City of Miami
Contractor company Fibrwrap Construction
Installer companies Fibrwrap Construction
Architects Engineer - Metric Engineering
MAPEI Distributor Construction Materials, White Cap, E&E Construction Supply
Credits Raul Ballester and Autumn Nelson
Project Manager Jason Alexander
MAPEI Coordination Steve Bradway, Mapei Corp. (USA)

Additional Attachments

Here you can download all documents related to this project

Product used for the project

Planibond 3C
Planibond 3C
Three-Component, Cementitious Corrosion Inhibitor and Bonding Agent Planibond…
Planibond AE
Planibond AE
High-Strength, Nonsag, Epoxy Anchoring Gel Planibond AE is a high-strength,…
Planiseal Traffic Coat
Planiseal Traffic Coat
Epoxy Overlay for Vehicular and Pedestrian Traffic Planiseal Traffic Coat is a…
Planitop 15
Planitop 15
Form-and-Pour, One-Component Repair Mortar Planitop 15 is a one-component,…
Planitop XS
Planitop XS
One-Component, Fast-Setting, Extended-Working-Time, Vertical and Overhead…
1216 - Planitop 18
Planitop 18
Product not available for this market,
contact us

Keep in touch

Subscribe to our newsletter to get Mapei news