Solutions for every type of project

Every jobsite has its own unique challenges. This is why MAPEI offers solutions organized according to site requirements and types of use. From CAD drawings to specification services to jobsite assistance, MAPEI system solutions encompass the complete building project.

Find your solution

Split-Slab Plaza Deck - Residential High-Rise

Residential high-rises
Waterproofing
Installation of waterproofing; Waterproofing; New construction

Issue: Prevent water intrusion into buildings following the construction of their foundation walls

Solution: Install a waterproofing system designed to allow for drainage and waterproofing protection

Application steps

1
Concrete substrate – Slope 1/4" per foot (6 mm per 0.30 m)
2
Planiseal CR1 waterproofing membrane applied at 60 mils – 1st coat
3
Overlap MAPEI LMR Fabric approximately 1" (2.5 cm) – embed into 1st coat of Planiseal CR1
4
Planiseal CR1 waterproofing membrane applied at 60 mils – 2nd coat
5
Mapedrain 35 drainage composite
6
Concrete topping slab