Below-grade waterproofing (blindside)

Residential high-rises
Blindside waterproofing
Installation of blindside waterproofing; New construction

Challenges: Prevent water intrusion into buildings that have limited access and ability to excavate during construction, and are adjacent to an existing structure or property line

Solution: Blindside waterproofing, through the Mapeproof waterproofing system, to prevent water intrusion

Application steps

1
Wood lagging
2
 Prefabricated drainage composites
3
Prefabricated drainage composites
4
Bentonite clay waterproofing membrane
5
Sodium bentonite granules
6
Prefabricated drainage composites (end outlet)

Headphones iconDo you need help? Contact us

NOT REMOVE

Keep in touch

Subscribe to our newsletter to get Mapei news